- 2024
- Kreisel Plant, soil stabilization – 15,000 m²
- Installation of concrete base for paving blocks (“FEM”) – 15,000 m²
- Installation of paving block (“FEM”) surface – 15,000 m²
- 2023
- Velyki Mosty – paving block (“FEM”) surface construction – 6,500 m²
- 2022
- Perechyn–Svaliava – regeneration of road pavement layers – 5,740 m²
- Boryslav – road regeneration – 1,380 m²
- 2021
- Cold recycling, Kurovychi–Rohatyn
- 2020
- Kirovohrad–Kryvyi Rih, cold recycling – 214,000 m²
- Sanoria – access roads to wind turbines – 20,500 m²
- Poltava–Krasnohrad, recycling of road structure layers – 156,600 m²
- Lviv–Sambir–Uzhhorod, recycling of road structure layers – 81,390 m²
- Zboriv–Sambir, recycling of road structure layers – 43,600 m²
- Shchyrets, sewer line – 3,300 linear m
- 2019
- Brody–Ternopil, recycling of road structure layers – 45,174 m²
- Kurovychi–Rohatyn, recycling of road structure layers – 24,570 m²
- Mykolaiv–Zhydachiv, recycling of road structure layers – 23,900 m²
- Rivne–Mlyniv, recycling of road structure layers – 24,720 m²
- Yantiv, recycling of road structure layers – 16,130 m²
- Construction of sites and access roads for engineering facilities – 257,000 m²
- 2018
- Yavoriv–Hrushiv, recycling of road structure layers – 86,200 m²
- Tatariv–Kamianets-Podilskyi, recycling of road structure layers – 97,000 m²
- Zhytomyr–Chernivtsi, recycling of road structure layers – 32,100 m²
- Brody–Chervonohrad, recycling of road structure layers – 29,500 m²
- Lviv–Rava-Ruska, recycling of road structure layers – 68,000 m²
- Construction of sites and access roads for engineering facilities – 52,500 m²
- 2017
- Borynia–Mokhnate, recycling of road structure layers – 105,190 m²
- I. Vysotska–Karpatske, recycling of road structure layers – 27,300 m²
- Chervonohrad–Peretoki, recycling of road structure layers – 40,500 m²
- Lviv–Ternopil, recycling of road structure layers – 68,500 m²
- Khodoriv, recycling of road structure layers – 37,000 m²
- Tatariv–Kamianets-Podilskyi, recycling of road structure layers – 54,000 m²
- 2016
- Repair of Yavoriv–Hrushiv road – 55 km
- Repair of Slavsk–Vygoda road – 78 km
- Repair of Yablunka–Turka road – 4 km
- Repair of Turka–Lopushanka road – 115 km
- Repair of Boberka–Borynia road – 45 km
- Repair of Velyki Hrybovychi–Dubliany road – 3 km
- Repair of Rava-Ruska–Maheriv road – 29 km
- Repair of Rava-Ruska road – 2.6 km
- Repair of Nemyriv–Dobrosyn road – 2.4 km
- Repair of Bibrka–Maidan road – 23 km
- Repair of Lviv–Ternopil road – 53.8 km
- Repair of Zaporizhzhia–Mariupol road – 44 km
- Repair of Chuhuiv–Milove road – 125.125 km
- Kolomyia – soil stabilization for the construction of a wood processing plant – 27 ha
- Total: 250,000 m²
- 2015
- 12 km of strategic Chuhuiv–Melove route (Kharkiv region), cold recycling
- 2014
- Dnipropetrovsk–Mykolaiv – 54,766 m²
- Kovel–Volodymyr-Volynskyi–Chervonohrad–Zhovkva (km 123+000–km 129+000) – 9,602.5 m²
- Construction of three low-rise duplex houses with built-in garages, 33 Krymska St., Lviv
- O141604 Chervonohrad–Peretoki – 14,600 m²
- O141602 Sokal–Stoyaniv – 14,000 m²
- O141602 Sokal–Stoyaniv (km 34+750–35+200, km 36+850–37+500) – 4,426 m²
- O140601 Rava-Ruska–Haiok – 6,200 m²
- O142001 Yavir–Hrushiv – 31,770 m²
- O141903 Borynia–Mokhnate – 12,880 m²
- O141607 Sokal–Chervonohrad (km 3+500–km 9+310) – 32,880 m²
- O141306 Radekhiv–Nyvytsi (km 0+600–km 1+700) – 4,250 m²
- M03 Kyiv–Kharkiv–Dovzhanskyi via T-17-37 and T-17-37 Bochky–Novyi Bayrak–Petrivka – 127,418.13 m²
- Lviv–Ternopil (km 68+000–km 72+000) – 42,220 m²
- 2013
- Oleksandrivka–Kirovohrad–Mykolaiv – 43,792 m²
- N02 Lviv–Ternopil – 23,491.5 m²
- Bohdanivska St. (from Hlyniany Trakt St. to Zolochivska St.) – 8,340 m²
- N09 Mukachevo–Radekhiv–Bohorodchany–Ivano-Frankivsk–Rohatyn–Bibrka–Lviv (Zelena St.) – 2,200 m²
- Construction of three low-rise duplex houses with built-in garages, 33 Krymska St., Lviv
- Syaivo St. – 7,128 m²
- Zelena St. – 30,051 m²
- 2012
- Oleksandrivka–Kirovohrad–Mykolaiv – 69,110.00 m²
- Kyiv–Chop – 233,265.70 m²
- Shevchenka St. – 4,983 m²
- Kolomyia – 10,000 m²
- 2011
- Novograd-Volynskyi – 90,436.50 m²
- Street reconstruction:
- — Shevchenka St. – 2,608.41 m²
- — Stryiska St. – 21,206 m²
- — Horodotska St. – 85,258 m²
- Road marking application at gas stations
- Current repairs (Stryi railway station)
- 2010
- Street reconstructions in Lviv:
- — Kulparkivska St. (stage 2–3) – 30,972 m²
- — Liubinska St. – 29,045 m²
- — Stryiska St. – 23,414 m²
- — Sakharova St. – 8,520 m²
- Kyiv–Chop highway – 67,464 m²