Portfolio

  • 2024
    • Kreisel Plant, soil stabilization – 15,000 m²
    • Installation of concrete base for paving blocks (“FEM”) – 15,000 m²
    • Installation of paving block (“FEM”) surface – 15,000 m²
  • 2023
    • Velyki Mosty – paving block (“FEM”) surface construction – 6,500 m²
  • 2022
    • Perechyn–Svaliava – regeneration of road pavement layers – 5,740 m²
    • Boryslav – road regeneration – 1,380 m²
  • 2021
    • Cold recycling, Kurovychi–Rohatyn
  • 2020
    • Kirovohrad–Kryvyi Rih, cold recycling – 214,000 m²
    • Sanoria – access roads to wind turbines – 20,500 m²
    • Poltava–Krasnohrad, recycling of road structure layers – 156,600 m²
    • Lviv–Sambir–Uzhhorod, recycling of road structure layers – 81,390 m²
    • Zboriv–Sambir, recycling of road structure layers – 43,600 m²
    • Shchyrets, sewer line – 3,300 linear m
  • 2019
    • Brody–Ternopil, recycling of road structure layers – 45,174 m²
    • Kurovychi–Rohatyn, recycling of road structure layers – 24,570 m²
    • Mykolaiv–Zhydachiv, recycling of road structure layers – 23,900 m²
    • Rivne–Mlyniv, recycling of road structure layers – 24,720 m²
    • Yantiv, recycling of road structure layers – 16,130 m²
    • Construction of sites and access roads for engineering facilities – 257,000 m²
  • 2018
    • Yavoriv–Hrushiv, recycling of road structure layers – 86,200 m²
    • Tatariv–Kamianets-Podilskyi, recycling of road structure layers – 97,000 m²
    • Zhytomyr–Chernivtsi, recycling of road structure layers – 32,100 m²
    • Brody–Chervonohrad, recycling of road structure layers – 29,500 m²
    • Lviv–Rava-Ruska, recycling of road structure layers – 68,000 m²
    • Construction of sites and access roads for engineering facilities – 52,500 m²
  • 2017
    • Borynia–Mokhnate, recycling of road structure layers – 105,190 m²
    • I. Vysotska–Karpatske, recycling of road structure layers – 27,300 m²
    • Chervonohrad–Peretoki, recycling of road structure layers – 40,500 m²
    • Lviv–Ternopil, recycling of road structure layers – 68,500 m²
    • Khodoriv, recycling of road structure layers – 37,000 m²
    • Tatariv–Kamianets-Podilskyi, recycling of road structure layers – 54,000 m²
  • 2016
    • Repair of Yavoriv–Hrushiv road – 55 km
    • Repair of Slavsk–Vygoda road – 78 km
    • Repair of Yablunka–Turka road – 4 km
    • Repair of Turka–Lopushanka road – 115 km
    • Repair of Boberka–Borynia road – 45 km
    • Repair of Velyki Hrybovychi–Dubliany road – 3 km
    • Repair of Rava-Ruska–Maheriv road – 29 km
    • Repair of Rava-Ruska road – 2.6 km
    • Repair of Nemyriv–Dobrosyn road – 2.4 km
    • Repair of Bibrka–Maidan road – 23 km
    • Repair of Lviv–Ternopil road – 53.8 km
    • Repair of Zaporizhzhia–Mariupol road – 44 km
    • Repair of Chuhuiv–Milove road – 125.125 km
    • Kolomyia – soil stabilization for the construction of a wood processing plant – 27 ha
    • Total: 250,000 m²
  • 2015
    • 12 km of strategic Chuhuiv–Melove route (Kharkiv region), cold recycling
  • 2014
    • Dnipropetrovsk–Mykolaiv – 54,766 m²
    • Kovel–Volodymyr-Volynskyi–Chervonohrad–Zhovkva (km 123+000–km 129+000) – 9,602.5 m²
    • Construction of three low-rise duplex houses with built-in garages, 33 Krymska St., Lviv
    • O141604 Chervonohrad–Peretoki – 14,600 m²
    • O141602 Sokal–Stoyaniv – 14,000 m²
    • O141602 Sokal–Stoyaniv (km 34+750–35+200, km 36+850–37+500) – 4,426 m²
    • O140601 Rava-Ruska–Haiok – 6,200 m²
    • O142001 Yavir–Hrushiv – 31,770 m²
    • O141903 Borynia–Mokhnate – 12,880 m²
    • O141607 Sokal–Chervonohrad (km 3+500–km 9+310) – 32,880 m²
    • O141306 Radekhiv–Nyvytsi (km 0+600–km 1+700) – 4,250 m²
    • M03 Kyiv–Kharkiv–Dovzhanskyi via T-17-37 and T-17-37 Bochky–Novyi Bayrak–Petrivka – 127,418.13 m²
    • Lviv–Ternopil (km 68+000–km 72+000) – 42,220 m²
  • 2013
    • Oleksandrivka–Kirovohrad–Mykolaiv – 43,792 m²
    • N02 Lviv–Ternopil – 23,491.5 m²
    • Bohdanivska St. (from Hlyniany Trakt St. to Zolochivska St.) – 8,340 m²
    • N09 Mukachevo–Radekhiv–Bohorodchany–Ivano-Frankivsk–Rohatyn–Bibrka–Lviv (Zelena St.) – 2,200 m²
    • Construction of three low-rise duplex houses with built-in garages, 33 Krymska St., Lviv
    • Syaivo St. – 7,128 m²
    • Zelena St. – 30,051 m²
  • 2012
    • Oleksandrivka–Kirovohrad–Mykolaiv – 69,110.00 m²
    • Kyiv–Chop – 233,265.70 m²
    • Shevchenka St. – 4,983 m²
    • Kolomyia – 10,000 m²
  • 2011
    • Novograd-Volynskyi – 90,436.50 m²
    • Street reconstruction:
    • — Shevchenka St. – 2,608.41 m²
    • — Stryiska St. – 21,206 m²
    • — Horodotska St. – 85,258 m²
    • Road marking application at gas stations
    • Current repairs (Stryi railway station)
  • 2010
    • Street reconstructions in Lviv:
    • — Kulparkivska St. (stage 2–3) – 30,972 m²
    • — Liubinska St. – 29,045 m²
    • — Stryiska St. – 23,414 m²
    • — Sakharova St. – 8,520 m²
    • Kyiv–Chop highway – 67,464 m²